From shop drawings in Chennai to a $22B portfolio in Chicago.
Twelve years, three countries, four functions — civil engineering, BIM/VDC, prefab manufacturing, and construction technology.
●
Jul 2021 — Present · Chicago, IL
Senior BIM Manager
R.G. Construction Services, Inc.
Lead VDC execution, constructability, clash coordination, model-based planning, prefab integration, and field-ready digital deliverables across healthcare, mission-critical data center, residential, commercial, gaming, and IPD programs. Extend beyond core BIM scope to drive automation, enterprise cloud workflows, robotics, analytics, and AI-enabled knowledge systems aligned with project delivery. Support IPD pursuits and interviews with RFP videos, websites, digital mockups, and technical storytelling as part of R.G. innovation efforts.
VDC LeadershipAI RolloutDynamoDustyACC / FormaIPDPower BI
5y
Dec 2016 — Jun 2021 · DFW, TX
BIM / VDC Manager · Structural EIT
Superior Concrete Products, Inc.
Built the first BIM model of the company's 5.2-acre precast manufacturing plant, creating a live planning environment for a new mixer system, future production changes, and expansion. Generated BIM for community + residential developments using drone data, conceptual clash analysis, immersive visualization, and VR walkthroughs. Helped launch and operate a $2M cold-formed steel framing startup after training on structural design and FRAMECAD; prepared estimates, design calculations, and shop drawings for multimillion-dollar precast screening wall and RECON retaining wall work.
Precast BIMFRAMECADDrone + VRRECON walls
2y
Apr 2013 — May 2015 · Chennai, India
Civil Engineer in Training
Form Space Order, Pvt. Ltd.
Contributed shop drawings for reinforced-concrete and brick-masonry buildings and supported field supervision. Assisted end-to-end coordination of a 3-story reinforced-concrete residential building — estimating, planning, scheduling, procurement, quality checks, and crew management. The foundation that taught me how a job site really runs.